Sunday, December 14, 2008
Sunday, December 7, 2008
Monday, November 24, 2008
Framing
Lots of progress today. The crew has started framing and I met with our decorator, Sara Noble, to review her ideas for our house.
Of course, I love them all.
The garage is on the far left and the study on the far right. A side/back corner view of the house. The 6 openings will be daylight windows in the basement.
Tuesday, October 28, 2008
Rain, Rain, Go Away...
But of course. As soon as the bulldozer was done digging the basement, the rain came in. It didn't let up all week. It rained at least an inch each day. The result? Huge amounts of sludge.
First a bobcat scraped it up, then we had 175 tons (yep, that's right!) of gravel brought in to be sure we have a steady, even base for the basement floor.
We have basement walls. I climbed the sludge mountain trying to get a good angle for a picture. On the way up, the sludge felt fairly dry and stable. Not the same on the way down. I hit a soft spot and my foot sunk about 2 feet. Tried to pull my foot out and left my shoe and sock in the hole! Too funny. Thankfully both feet didn't sink. Drove home minus one shoe, but I had a good laugh.
Tuesday, October 21, 2008